Monday, March 2, 2009

Metal Buildings


The Geneva Project includes three metal buildings, each with a distinct use. A pre-engineered building was erected to house the concrete admixture chemicals. A second, conventionally engineered building, encloses bins that hold aggregate to be conveyed to the concrete mixer. The Third and largest building stands 85 feet high and holds the entire concrete mixer plant. Included in the building is a Mezzanine, equipment hoist, removable wall panel, and mixer truck drive through.
This Batch Plant is a state of the art facility and shows the variety of uses metal buildings provide.